72V280AH Lithium Battery System Solution for Industrial Aerial Work Platform

December 16, 2025

Latest company case about 72V280AH Lithium Battery System Solution for Industrial Aerial Work Platform

An Australian industrial vehicle manufacturer is facing a bottleneck of insufficient operating time for aerial work platforms. Its traditional power system can only maintain continuous operation for 6 to 7 hours under high-intensity working conditions, and there are noise pollution and emission problems, which are difficult to meet the increasingly strict environmental regulations in Europe and the customers' demands for long-term operation.

latest company case about 72V280AH Lithium Battery System Solution for Industrial Aerial Work Platform  0

Solution: Customized 72V280AH intelligent lithium battery system

We provided the manufacturer with a complete high-voltage lithium battery solution:

  • High energy density battery pack: Equipped with 3.2V 280Ah lithium iron phosphate cells, the energy density is increased by 40%
  • Multi-level BMS architecture: Achieve triple security monitoring at the cell level, module level, and system level
  • CAN bus integration: Seamless connection with the original vehicle control system to achieve data intercommunication
Project Name Standard Requirement Condition
Operating Voltage 57.5V~84V
Battery Capacity 280Ah 23S1P
Battery Energy 20.6KWh 25°C (100% DOD @ 1C rate)
Battery Energy 14.5KWh -20°C (100% DOD @ 1C rate)
Weight ≤160kg
Product Size - Width 465mm
Product Size - Length 950mm
Product Size - Height 240mm
Enclosure Material 1.5mm cold rolled iron plate
Continuous Charging Current 100A
Peak Discharge Current 450A (duration 60S) Subject to BMS setting parameters
Rated Discharge Current 220A
Charging Cut-off Voltage 84V Calculated according to 3.65V voltage of each cell
Discharge Cut-off Voltage 57.5V Calculated according to 2.5V voltage of each cell
Charging Method CC-CV Constant current and constant voltage charging
Self-discharge ≤2% per month 25°C
Implementation effectiveness

1. The operational efficiency has been significantly enhanced
  • Continuous operation time has been extended by 30% : from an average of 6.5 hours to 8.5 hours
  • Charging efficiency optimization: Supports 1C fast charging, reducing charging time to 2 hours (traditional systems require 6 hours)
  • Energy recovery system: Recovers potential energy during downward operations, enhancing energy efficiency by an additional 5%
2. Comprehensive compliance with safety standards has been achieved
  • Certified by CE/UN38.3/IEC: Complies with the EU Machinery Directive 2006/42/EC and battery safety standards
  • Real-time security monitoring: The BMS system monitors 256 parameters 24 hours a day, with a fault early warning accuracy rate of 99.8%
  • Dust and water resistance design: Passed the IP67 protection level test
3. Comprehensive benefits
  • Reduction in operation and maintenance costs: Maintenance expenses are expected to be reduced by 45% within three years
  • Carbon emissions to zero: Achieve complete zero emissions during the operation stage
  • Customer satisfaction has improved: End users have reported that the availability rate of devices has increased by 25%

By deploying a 72V280AH custom lithium battery system, the customer successfully increased the operating time of the aerial work platform by 30%, while ensuring 100% compliance with safety and environmental regulations, achieving a dual breakthrough in performance and compliance.

Get in touch with us